Home
Search results “Xtreme mining and demolition contractors”
Oxbow Mining Silo - Controlled Demolition, Inc.
 
02:30
Controlled Demolition, Inc. (CDI) of Phoenix, Maryland, USA (acting as Implosion Subcontractor to Main Demolition Contractor, DEMCO, Inc. of Buffalo, New York) performs the successful explosives felling of a 140’ tall, reinforced concrete silo at the Oxbow Coal Mine in Somerset, Colorado at 9:40 AM on Friday, April 29, 2016.
Views: 27339 TheLoizeauxGroupLLC
Magma Copper smelter chimney stack fall
 
02:21
Superior, Arizona — (November 10, 2018) Resolution Copper’s demolition contractor safely and successfully completed the controlled demolition of the Magma Copper smelter’s chimney stack, which was structurally unsound and posed a significant threat to safety. Resolution Copper’s number one priority is ensuring the health and safety of our employees and the community, and finalizing this latest phase of the 15-year reclamation effort is a vital step in fulfilling our commitment to health, safety and environmental stewardship. In addition to proactively addressing the safety threat posed by the crumbling chimney stack, it was also necessary to remove smelter structures in order to clean all contaminants out of the soil that had accumulated during five decades of the Magma Copper Company’s smelting operations, which started in 1924 and ended in 1971. Safe removal and cleanup of the smelter complex is a major milestone in Resolution Copper’s broader reclamation of the West Plant property adjacent to Superior, which began in 2005 and is on schedule for completion in 2020.
Views: 10431 Resolution Copper
USA JGXR 40-1 (6 Truckloads in 7 minutes) Xcentric Ripper
 
01:28
Xcentric Ripper JGXR 40-1 on a Komatsu PC360 widening the lanes of Interstate 820 in Ft. Worth Texas. The job was to remove rock approximately 30 feet ( 10 meters) deep and 75 feet( 25 meters) in length underneath a train trestle. They had to remove this rock from around old railroad bridge pillars to be able remove the bridgework. During the day we excavated rock under the bridge. The contractor Renaissance Construction stated after some working had been done " I was impressed, when that Xcentric Ripper laid out 5 to 6 truckloads of rock material in 7 minutes"
Views: 4305 XcentricRipper
Concrete Saw for Skid Steers from Gater Grapples
 
00:46
http://www.attachmart.com/attachments/16456 Gater Grapples' CS240 skid steer mounted Concrete and Asphalt Saw is the ideal attachment for contractors and municipalities engaged in underground utility work, road and parking lot maintenance, driveway, sidewalk and foundation repair. Working from the comfort and safety of the cab, the operator commands a 24" diamond blade capable of making a 10.5" deep cut in concrete or asphalt. A 25 gallon water tank with electric pump provides cooling and lubrication for the blade. To assist the operator in maintaining the proper blade speed, the cab controls are equipped with an RPM Monitoring System allowing the operator to make necessary adjustments to the feed rate/travel speed. The CS240 features 24 inches of horizontal travel to position the saw close to curbs and foundation walls. Attachmart.com is an online marketplace for new and used attachments for construction, demolition, logging, mining and material handling machinery.
Views: 3416 attachMARTcom
ABANDONED HOUSE |TAKE ACTION
 
15:35
This is the second day of camp. Hope you enjoy this vlog. CHURCH CHANNEL - https://www.youtube.com/user/Avivamento07 (Camp videos should be up soon, depending when you are watching this.) Grace & Peace Motto -Do it with Love & Be Better- FOLLOW ON SOCIAL MEDIA & YOUTUBE CHANNEL Lucas - @mrcampos71 SevntyOne - @SevntyOne Check out our website! - www.sevntyone.com Contact : [email protected]